Unit 2 Control

Reactor hall

Unit 2 · shift B Nominal

Output
412 MW of 600
412MW
Grid frequency
50.01 Hz
50.01Hz
Turbine speed
3,002 rpm
3,002rpm
Coolant temp
291 °C
291°C
Subsystems
LoopStatusLoadAuto
Primary coolant72%
Steam generator A81%
Steam generator B94%
Emergency diesel0%
Tank levelsNormal
Coolant
Feedwater
Boric acid
Diesel
Coolant
0100 Target min 58max 88
Diesel
0100 Target Low 20
Setpoints
62%
80%
35ppm
TargetMW
Fuel burnup

71% of cycle · refuel in 118 days

RK
R. Kaplan
Shift supervisor · on since 06:00
MTM. Tan · reactor operator
Annunciator1 trip2 high
  • Pump 3 vibrationTrip
  • SG-B outlet tempHigh
  • Reactor protectionArmed
  • Containment pressureNormal
  • Rod bank DMoving
  • Emergency dieselStandby
  • Grid breakerClosed
  • Grid operator ackPending
  • Fire suppressionOff
Shift eventssince 06:00
  1. Shift B handover

    R. Kaplan on as supervisor.

  2. Cooling tower level restored
  3. Pump 3 tripped on vibration

    Loop transferred to pump 4.

  4. SG-B outlet temperature high
  5. Turbine trip test

    Passed; resyncing to grid.

  6. Boron sample due
Unit data
Unit
2 · PWR, 4-loop
Rated output
600 MWe
Cycle
18 · day 247 of 365
Burnup
38.2 GWd/tU
Rod bank D
step 162 of 228
Last outage
Permit
NRG-U2-2026-00417-B
Alarms2
TimePointLevel
14:12SG-B outlet tempHigh
13:58Pump 3 vibrationTrip
12:20Cooling tower levelCleared
Start-up checklist
Pre-start
Criticality
Withdraw bank D in 2-step increments and hold at each step.
Sync to grid
Match frequency to 50.00 Hz ± 0.05 before closing the breaker.
Interlocks
∅ No interlocks tripped Protection system healthy.

— the same dialog, opened for real (HTML popover, no JS)

Turbine trip test passed.
Pump 3 tripped on vibration.
Grid operator has not acknowledged.
Setpoint applied.

Turbines

Three steam turbines: speed, vibration and bearing temperatures.

Grid

Export to the grid: frequency, voltage and the dispatch schedule.

Logs

Operator log and alarm history for this shift.